This amazing Nike Activation was constructed entirely by the Harry the hirer Productions team.
The pyramid truss structure stood proud in Melbourne’s Birrarung Marr with a height of 18m and a span of 34m.
Lighting included 12 x Martin MAC Axioms, 20 x MAC Auras, 8 x Claypaky Alpha 700 profiles, 50 x ShowPro Quad 18 and a grandMA light for control.
It was a huge feat, and everyone was thrilled with the outcome. As you can see from the photos the design was nothing short of spectacular.
Creative Production by: @Studio Messa for Nike Football
Build and Technical Production: @Harrythehirer_productions
Project Manager: Jason Ghazal
Photography: @ds_oficina